Skip to content

Facing home insurance non-renewal because of knob and tube in Alameda or Contra Costa County? We provide certified inspection letters and turnkey replacement. How the insurance letter works

Ally Electric and Solar Inc.

200 amp panel upgrades and knob and tube removal in El Cerrito

El Cerrito's hillside homes from the 1930s through the 1950s often have the original panel low on a garage wall or under the house, with service sized for a home that never planned on an EV, a heat pump or a hot tub.

Permits issued by
City of El Cerrito Building Division
County
Contra Costa County
Neighborhoods we work in
El Cerrito Hills, Mira Vista, Fairmount, Arlington

Steep driveways and split-level garages make panel relocation a common part of the conversation.

Estimate your timeline

Three answers, then a planning timeline for your city.

1What do you need?
2What service do you have now?

Your timeline appears here once all three are answered.

What we usually find in El Cerrito homes

  • Panels low on garage walls or under the house
  • Federal Pacific or Zinsco panels in 1950s homes
  • Long circuit runs to upper floors on split-level lots

How El Cerrito homes connect to PG&E

El Cerrito homes are mostly fed overhead. On steep lots the service often lands on a lower garage level, far from where new loads like EV chargers will go.

Electrical services in El Cerrito

100A to 200A main service panel upgrades

New 200A meter main or panel, grounding and bonding brought to current code, and the PG&E application handled for overhead and underground services.

About panel upgrades

Knob and tube removal

Full rewiring that works around lath and plaster, plus a written compliance letter your insurance underwriter can accept.

About knob & tube removal

Smart panels and electrification prep

Span and other load-managing panels that can let a home add an EV charger or heat pump without a full service upgrade, when the load calculation supports it.

About smart panels

Generator transfer switches and exterior disconnects

Safe generator hookups for PG&E shutoffs and outdoor emergency disconnects for homes in Orinda, Moraga, Kensington and the Oakland and Berkeley hills.

About generator transfer switches

Federal Pacific and Zinsco panel replacement

Replacement of Federal Pacific Stab-Lok and Zinsco panels, brands with well-documented breaker problems that many insurers and home inspectors flag.

About fpe & zinsco replacement

How a El Cerrito upgrade runs

  1. 1

    Load calculation

    We measure what the home draws today and what it will draw after EVs, heat pumps or remodels, and size the service to match.

  2. 2

    PG&E service planning

    We pull the permit and file the PG&E application, then coordinate the disconnect date for overhead or underground service.

  3. 3

    Heavy-up and grounding

    New meter main or panel, service entrance, and grounding and bonding brought to current code, usually in one working day.

  4. 4

    Green tag and reconnection

    We meet the inspector, get the green tag, and PG&E restores power to the new service.

Licensing and guarantees

  • Family-owned in Richmond since 2002

    Electrical work since 2002 and solar since 2010, from the same family.

  • California C-10 license #806465

    Verify it any time on the Contractors State License Board site.

  • $2M general liability

    Certificate of insurance available on request before work starts.

  • First-inspection guarantee

    If your work doesn't pass the first city inspection, we fix it and schedule the re-inspection at no cost.

El Cerrito panel upgrade questions

Who issues electrical permits for panel upgrades in El Cerrito?

Electrical permits for El Cerrito homes are issued by City of El Cerrito Building Division. We pull the permit, schedule the inspection and meet the inspector on site.

How long does a panel upgrade take in El Cerrito?

Plan on 3–10 business days for the permit and roughly 4–12 weeks for PG&E planning when the service itself changes. The on-site work is usually one to two days. We confirm your actual timeline after the site visit.

Can I add an EV charger to my El Cerrito home without a 200A upgrade?

Sometimes. A load calculation shows what your service can carry. Garage-level panels, which are common in El Cerrito, often make the charger run short and inexpensive once capacity is confirmed.

My insurance company is non-renewing my policy because of knob and tube. What do I do?

Insurers in California increasingly decline or non-renew homes with active knob and tube wiring. We inspect the home and give you a written letter describing what's there. Once we remove it, we issue a completion letter with the finaled permit, which is what most underwriters ask for to reinstate or write a new policy.

How long does PG&E take on a 200 amp panel upgrade?

It depends on whether your service is overhead or underground and whether PG&E needs to change anything on their side. A straightforward overhead upgrade usually moves in weeks; underground services or transformer work can take longer. We submit the PG&E application early and coordinate the disconnect and reconnect so you're without power for one day of work.

How much does a 100A to 200A panel upgrade cost in the East Bay?

The main cost drivers are whether the panel stays in place or moves, overhead versus underground service, grounding and bonding corrections, and whether stucco, siding or drywall needs opening. We give a fixed written price after a free site visit, including permit and PG&E coordination.