100A to 200A main service panel upgrades
New 200A meter main or panel, grounding and bonding brought to current code, and the PG&E application handled for overhead and underground services.
About panel upgradesFacing home insurance non-renewal because of knob and tube in Alameda or Contra Costa County? We provide certified inspection letters and turnkey replacement. How the insurance letter works
Richmond mixes early-1900s homes in Point Richmond with large stocks of 1940s wartime housing. Both commonly arrive with undersized service, and the older homes add knob and tube to the scope.
Homes near the shoreline see more corrosion at the meter and service entrance, so we inspect grounding and the weatherhead closely.
Three answers, then a planning timeline for your city.
Your timeline appears here once all three are answered.
Our home base
Ally Electric & Solar is a family business based right here in Richmond, with our office at Marina Bay. We've done electrical work in the city since 2002 and solar since 2010, so we know its housing well, from Point Richmond's early-1900s homes to the 1940s houses built for the wartime shipyards.
Many of those homes still run on 60A service, and homes near the shoreline see more corrosion at the meter and service entrance. Being local means quicker site visits and a crew nearby if anything ever needs a second look.
Most Richmond homes are fed overhead. Newer developments such as Marina Bay are underground, and shoreline homes need extra attention to corrosion at the service entrance.
New 200A meter main or panel, grounding and bonding brought to current code, and the PG&E application handled for overhead and underground services.
About panel upgradesFull rewiring that works around lath and plaster, plus a written compliance letter your insurance underwriter can accept.
About knob & tube removalSpan and other load-managing panels that can let a home add an EV charger or heat pump without a full service upgrade, when the load calculation supports it.
About smart panelsSafe generator hookups for PG&E shutoffs and outdoor emergency disconnects for homes in Orinda, Moraga, Kensington and the Oakland and Berkeley hills.
About generator transfer switchesReplacement of Federal Pacific Stab-Lok and Zinsco panels, brands with well-documented breaker problems that many insurers and home inspectors flag.
About fpe & zinsco replacementWe measure what the home draws today and what it will draw after EVs, heat pumps or remodels, and size the service to match.
We pull the permit and file the PG&E application, then coordinate the disconnect date for overhead or underground service.
New meter main or panel, service entrance, and grounding and bonding brought to current code, usually in one working day.
We meet the inspector, get the green tag, and PG&E restores power to the new service.
Family-owned in Richmond since 2002
Electrical work since 2002 and solar since 2010, from the same family.
California C-10 license #806465
Verify it any time on the Contractors State License Board site.
$2M general liability
Certificate of insurance available on request before work starts.
First-inspection guarantee
If your work doesn't pass the first city inspection, we fix it and schedule the re-inspection at no cost.
Electrical permits for Richmond homes are issued by City of Richmond Planning & Building Services. We pull the permit, schedule the inspection and meet the inspector on site.
Plan on 5–15 business days for the permit and roughly 4–12 weeks for PG&E planning when the service itself changes. The on-site work is usually one to two days. We confirm your actual timeline after the site visit.
Yes. Both brands have well-documented breaker problems and many insurers flag them. Replacing one is usually the moment to size the service for what the home needs now.
Insurers in California increasingly decline or non-renew homes with active knob and tube wiring. We inspect the home and give you a written letter describing what's there. Once we remove it, we issue a completion letter with the finaled permit, which is what most underwriters ask for to reinstate or write a new policy.
It depends on whether your service is overhead or underground and whether PG&E needs to change anything on their side. A straightforward overhead upgrade usually moves in weeks; underground services or transformer work can take longer. We submit the PG&E application early and coordinate the disconnect and reconnect so you're without power for one day of work.
The main cost drivers are whether the panel stays in place or moves, overhead versus underground service, grounding and bonding corrections, and whether stucco, siding or drywall needs opening. We give a fixed written price after a free site visit, including permit and PG&E coordination.